PDS/SBN EPOXI Mission Data Review

University of Maryland, College Park

23 July 2009

Agenda

Last update: 23 October 2009, S. McLaughlin

Telecon instructions and a cast of characters  follow.

Thursday, 23 July 2009, 8:30am-6:30pm EST

Opening Remarks Mike A'Hearn 8:45am
ID Data Set Lead/Backup Reviewer Start Time (EDT)
dif-cal-hrii-2-epoxi-calibrations-v1.0 Raw HRI-IR calibration spectra M. DiSanti/L. Feaga 9:00 am
dif-e-hrii-2-epoxi-earth-v1.0
Raw HRI-IR spectra of Earth M. DiSanti/L. Feaga 9:30 am
dif-e-hrii-3_4-epoxi-earth-v1.0
Calibrated HRI-IR spectra of Earth M. DiSanti/L. Feaga 10:00 am
Break 10:45 am
dif-e-mri-2-epoxi-earth-v1.0
Raw MRI images of Earth W. Borucki/T. Farnham 11:00 am
dif-e-mri-3_4-epoxi-earth-v1.0
Calibrated MRI images of Earth W. Borucki/T. Farnham 11:30 am
dif-cal-mri-2-epoxi-calibrations-v1.0
Raw MRI calibration images W. Borucki/T. Farnham 12:00 pm
Lunch 12:45 pm
dif-c_e_x-spice-6-v1.0
SPICE data T. Farnham/L. Feaga 2:00 pm
dif-cal-hrii_hriv_mri-6-epoxi-temps-v1.0
Temperatures from multiple spacecraft sensors M. DiSanti/L. Feaga 2:30 pm
di-c-hrii_hriv_mri_its-6-doc-set-v2.0
Collection of documentation for the raw and calibrated data sets M. DiSanti/M. Smith 3:00 pm
Break 3:45 pm
dif-x-hriv-2-epoxi-exoplanets-v1.0
Raw HRIV clear filter images of transiting planet systems W. Borucki/M. Smith 4:00 pm
dif-x-hriv-3-epoxi-exoplanets-v1.0
Calibrated HRIV clear filter images of transiting planet systems W. Borucki/M. Smith 4:30 pm
dif-e-hriv-2-epoxi-earth-v1.0
Raw HRIV images of Earth M. Smith/T. Farnham 5:00 pm
dif-e-hriv-3_4-epoxi-earth-v1.0
Calibrated HRIV images of Earth M. Smith/T. Farnham 5:30 pm
dif-cal-hriv-2-epoxi-calibrations-v1.0
Raw HRIV calibration images M. Smith/T. Farnham 6:00 pm
Adjourn 6:30 pm
Group dinner 7:00 pm


Telecon instructions

A teleconference line with toll-free access will be available during the meeting, beginning about 15 minutes prior to the scheduled start time each day. To join the telecon:

If you are the first to call in, you will hear silence until the next caller arrives. If you call in too early, the pass code will not be accepted and you will have to call back.

In case of problems, you can try to reach Anne Raugh or Michael A'Hearn by email, but your best option is to call Andrew Wehrli (SBN) at 301-405-5024.


Attendees

Note that some may be present only by telecon.

External Reviewers

Data Preparers

PDS Project

PDS Small Bodies Node